Post braze and still hot. A little saggy but not bad for doing the whole joint without rotating it.
Tubes loaded (minus washer and nut) and ready for flux
Checking the distance from the ST to the support. Checking at the top and the bottom ensures that the tube is indeed square.
The ST/bottom bracket area of my frame fixture
Tuesday, January 23, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment